top of page

Licensing

Guiding you through your AM journey

Machine Assessment

Machine Assessment

(Product: MQS-Assessment)

​​

Review of one machine type

Assessment of machine features against current EASA Part-21/G machine qualification requirements

Delivery of a gap list and proposed specification items to address identified gaps

Duration: 1 day

Workshop with your Development & Engineering Team

Facilitated by AAMC Expert staff

on-site or remote

Duration: 2 days

 

Training in Aviation Regulations

(Product: TES-AAMC-Part-21/G)

 


Training on EASA Aviation Regulation with focus on Part-21/G Production certification

Delivered by AAMC Expert staff

up to 8 participants

on-site

Duration: 1 day

Development Support 

Machine Development Support

(Product: MQS-Specifications)

Consultation and support to derive requirements for the development of your next generation production machine that integrates aviation qualification requirements (machine features).


Includes:​

  • Assessment of the machine features using specialized Aviation Industry knowledge

  • Gap-Analysis of the current machine features

  • Support to define Specification Points for the next machine generation

  • Review of machine prototype and final machine design

  • Participation in Engineering meetings:

    • Kick-/off Initial Technical Coordination Meeting (ITCM) 

    • Preliminary Design Review (PDR)

    • Design Freeze Review (DFR)

    • Project Completion Meeting

Machine Qualification

Machine Qualification at Facility

(Product: MQS-QM)

Qualification of one machine type within your facility under the approved AAMC Aviation Quality Management System.


Includes:

  • Support to set up a dedicated Aviation-certified production space at an internal or external location, in accordance with Aviation certification requirements and the installation conditions of the production system.

  • Integration of the production space and machine into The Aviation AM Centre's EASA Production Approval, including extension of the AAMC-QMS with its production processes and authorized personnel.

  • Adaptation and Audit of your QMS and facility to comply with AAMC's certified Quality Management System, including material management, qualified personnel and quality assurance processes.

  • Development of a suitable Machine Qualification Program (e.g. machine functional test geometries).

  • Demonstration of an exemplary production order under AAMC's Aviation QMS


This service aims to qualify your machine under AAMC's Quality Management System.
Project duration is 4-9 months, depending on facility readiness


Training in QMS

 


2-day training on AAMC's EASA approved Quality Management System and Quality Management Documentation, including:

AAMC POE (Handbook)

AAMC Procedures

AAMC Forms

EASA Form 1 Issuance

Up to 8 participants 

on-site
Duration: 2 days

Audit

Certification Audit at Facility

(Product: PPQS-Audit)

Audit of your facility and relevant QM-System elements against current EASA Part-21/G regulation to obtain a Supplier Qualification Approval under AAMC's Aviation Quality Management System


Audit by AAMC's experts, including issuance of audit report with findings and proposed remedial actions

Project duration is dependent on availability and readiness of the facility, staff availability, and Aviation Authority personnel availability for audits.

This service aims to qualify your facility & machine under AAMC'S Quality Management System and to produce a certified aviation part in accordance with Aviation regulation and obtain the capability to issue parts with an EASA Form 1 Airworthiness Release Certificate.

bottom of page